Considering the Project engineer:in the area of road and rail construction 80-100% - Brig position at AFRY in Brig (Vallese) on a other contract contract?
This position requires a G Permit (annual renewal) and triggers wage-withholding by the employer AFRY. In the Canton of Vallese the rate depends on bracket, marital status and dependants; the 2024 New Agreement adds an Italian side tax.
Swiss social contributions include AVS (5.3%), unemployment insurance (1.1%) and LPP (occupational pension). Use our free tax simulator to estimate the net salary for Project engineer:in the area of road and rail construction 80-100% - Brig in engineering and compare the cost of living between Switzerland and Italy.
Frequently asked questions
What does a Project engineer:in the area of road and rail construction 80-100% - Brig at AFRY earn net in Brig?
For Project engineer:in the area of road and rail construction 80-100% - Brig at AFRY the net depends on gross, Vallese withholding (2-15%), AVS/LPP and family deductions. Contract: other contract. Our simulator gives a personalised estimate.
How does LAMal work when applying to Project engineer:in the area of road and rail construction 80-100% - Brig at AFRY?
Before signing with AFRY, note that LAMal is mandatory within 3 months since 2024. The average premium in Vallese depends on the model. See our LAMal comparator.