Basel mobility

In the Basel region, getting to work means dealing with roadworks, closures, public transport and, where there is a border, waiting times at the crossings. This page brings together current restrictions, measured waiting times and our articles on traffic and transport.

The area borders Germany and France: for those who cross the border every day, the rules and prices on both sides matter. Official sources publish in German and French; data, notices and articles are collected here and updated when they change.

Updated on

Fastest crossing of the week
0.7 min
Riehen – Weil am Rhein, week ending 5 October 2026
Road closures in force or imminent
23
reports as of 6 October 2026
Roadworks active or imminent
33
reports as of 6 October 2026

Border crossing waits

Average waiting time at the canton’s border crossings in the week from 29 September 2026 to 5 October 2026, fastest first.

Updated on

Source: Frontaliere Ticino border-crossing monitoring

Closures, roadworks and disruptions

Restrictions in force or starting in the coming days on the canton’s roads and public transport.

  • A2 Basel -> Luzern Svincolo autostradale Basel-Badischer Bahnhof Situazione: raccordo autostradale chiuso in entrata cantiere, lunghezza [km] 0.4 Aggiunta 1: limite temporaneo larghezza Larghezza…: Closure — until 30 November 2026
  • A2 Basel -> Luzern tra Galleria Galleria Schwarzwald E Svincolo autostradale Basel-Wettstein Situazione: uscita chiusa cantiere, lunghezza [km] 0.2: Closure — until 30 November 2026
  • A2 Luzern -> Basel Svincolo autostradale Basel-Badischer Bahnhof Situazione: raccordo autostradale chiuso in entrata cantiere: Closure — until 30 November 2026
  • A2 Luzern -> Basel Svincolo autostradale Basel-Badischer Bahnhof Situazione: raccordo autostradale chiuso in entrata cantiere, lunghezza [km] 0.1 Aggiunta 1: limite temporaneo larghezza Larghezza…: Closure — until 30 November 2026
  • A22 Liestal <-> Sissach tra Svincolo autostradale Pratteln-Est E Svincolo autostradale Liestal-Nord Situazione: chiusa cantiere, lunghezza [km] 3.5: Closure — until 6 November 2026
  • A18 Grellingen <-> Raccordo di Hagnau tra Svincolo autostradale Reinach-Nord E Svincolo autostradale Reinach-Sud Situazione: chiusa cantiere, lunghezza [km] 2.1: Closure — until 5 November 2026
  • A18 Grellingen <-> Raccordo di Hagnau tra Galleria Galleria Schänzli E Svincolo autostradale Muttenz-Sud Situazione: chiusa cantiere, lunghezza [km] 1.7: Closure — until 11 November 2026
  • Autobahnzubringer Basel-City Basilea-City -> Raccordo di Gellert tra Svincolo autostradale Basilea-City E Raccordo autostradale Raccordo di Gellert Situazione: raccordo autostradale chiuso in…: Closure — until 16 October 2026

Updated on

Source: Federal Roads Office (FEDRO) and cantonal notices

Official notices

Latest releases on this topic from the canton’s administrations and public bodies, linked to the source. Titles are in the original wording.

Updated on

Recommended articles

Useful tools