The opportunity Our High Voltage Products division is a worldwide specialist in power transmission and distribution.
Our Service Unit supports customers around the globe with Generator Circuit Breaker systems (GCB) and gas‑insulated switchgear (GIS).
From training and commissioning to maintenance, troubleshooting, upgrades, and replacements — we ensure critical power infrastructure works reliably, safely, and efficiently.
Description
The opportunity Our High Voltage Products division is a worldwide specialist in power transmission and distribution.
Our Service Unit supports customers around the globe with Generator Circuit Breaker systems (GCB) and gas‑insulated switchgear (GIS).
From training and commissioning to maintenance, troubleshooting, upgrades, and replacements — we ensure critical power infrastructure works reliably, safely, and efficiently.
Considering the Field Service Engineer – Energy & Power (f/m/d) position at Hitachi Energy in Zurich, Switzerland (Zurigo) on a other contract contract?
This position requires a G Permit (annual renewal) and triggers wage-withholding by the employer Hitachi Energy. In the Canton of Zurigo the rate depends on bracket, marital status and dependants; the 2024 New Agreement adds an Italian side tax.
Swiss social contributions include AVS (5.3%), unemployment insurance (1.1%) and LPP (occupational pension). Use our free tax simulator to estimate the net salary for Field Service Engineer – Energy & Power (f/m/d) in engineering and compare the cost of living between Switzerland and Italy.
Frequently asked questions
What does a Field Service Engineer – Energy & Power (f/m/d) at Hitachi Energy earn net in Zurich, Switzerland?
For Field Service Engineer – Energy & Power (f/m/d) at Hitachi Energy the net depends on gross, Zurigo withholding (2-15%), AVS/LPP and family deductions. Contract: other contract. Our simulator gives a personalised estimate.
How does LAMal work when applying to Field Service Engineer – Energy & Power (f/m/d) at Hitachi Energy?
Before signing with Hitachi Energy, note that LAMal is mandatory within 3 months since 2024. The average premium in Zurigo depends on the model. See our LAMal comparator.