Considering the Project Engineer Artificial Buildings (Bridge Construction) 80-100% - Chur position at AFRY in Chur (Graubünden) on a other contract contract?
This position requires a G Permit (annual renewal) and triggers wage-withholding by the employer AFRY. In the Canton of Graubünden the rate depends on bracket, marital status and dependants; the 2024 New Agreement adds an Italian side tax.
Swiss social contributions include AVS (5.3%), unemployment insurance (1.1%) and LPP (occupational pension). Use our free tax simulator to estimate the net salary for Project Engineer Artificial Buildings (Bridge Construction) 80-100% - Chur in engineering and compare the cost of living between Switzerland and Italy.
Frequently asked questions
What does a Project Engineer Artificial Buildings (Bridge Construction) 80-100% - Chur at AFRY earn net in Chur?
For Project Engineer Artificial Buildings (Bridge Construction) 80-100% - Chur at AFRY the net depends on gross, Graubünden withholding (2-15%), AVS/LPP and family deductions. Contract: other contract. Our simulator gives a personalised estimate.
How does LAMal work when applying to Project Engineer Artificial Buildings (Bridge Construction) 80-100% - Chur at AFRY?
Before signing with AFRY, note that LAMal is mandatory within 3 months since 2024. The average premium in Graubünden depends on the model. See our LAMal comparator.