Automatic operator with assembly and commissioning plant — fachkraft.ch GmbH
- Location
- Lugano
- Contract
- full-time
- Posted
- Yesterday
Role overview
Automatic operator with assembly and commissioning plant — fachkraft.ch GmbH based in Lugano (TI), Switzerland, offers diverse career opportunities and modern working conditions.
We are looking for motivated professionals who want to contribute to the further development of our company with competence and passion.
- Automatic operator with assembly and commissioning plant — fachkraft.ch GmbH based in Lugano (TI), Switzerland, offers diverse career opportunities and modern working conditions.
- We are looking for motivated professionals who want to contribute to the further development of our company with competence and passion.
Application process
- now for this exciting position.
Additional details
- Apply now for this exciting position.
Questions about this listing
What salary does fachkraft.ch GmbH offer for this role?
fachkraft.ch GmbH lists CHF 49'500 - 75'000 gross per year for this position in Lugano. This is the salary published in the original listing (or, when the employer omits a figure, a realistic estimate for the role and sector) — the calculator on this site converts it to your actual net take-home once cross-border tax and social contributions are applied.
Is this a full-time role, and what type of contract does fachkraft.ch GmbH offer?
This listing is a full-time position. The contract type shown here comes directly from the employer's original posting; always confirm exact hours, notice period and probation length with fachkraft.ch GmbH during the application process, since these details can vary by role even within the same contract category.
Do I need the G permit to apply for this role in Ticino as an Italian cross-border worker?
Yes, if you are resident in Italy within the 20 km border zone. The Swiss employer files the G-permit application at the Ticino cantonal migration office after the contract is signed — first issuance takes 2-6 weeks, then automatic yearly renewal for as long as the employment continues. Weekly return to your Italian home is required to keep the status.
How do I apply for this position at fachkraft.ch GmbH?
Use the "Apply now" button on this page — it links directly to fachkraft.ch GmbH's original listing at fachkraft.ch, so your application goes straight to the employer's own applicant-tracking system. Frontaliere Ticino does not collect or forward applications itself.