Automatic operator with assembly and commissioning plant — Stellentreff AG
- Location
- Zofingen
- Contract
- full-time
- Posted
- 5 days ago
Role overview
Activities Manufacture, assembly and assembly of machinery assemblies according to drawing.
Construction and initial commissioning of machine and plant components our at the plant Zofingen Active cooperation in the construction and commissioning of new plants at customers in Germany and abroad Analysis and elimination of (mechanical, pneumatic, hydraulic and electrical) faults and sources of error MIG/MAG/WIG Welding service and repair operations in Germany and abroad
Completed training as a polymechanic (m/f/d), automatic (m/f/d) or machine closer (m/f/d) or comparable qualifications Craftsmanship skills and relevant experience in mechanical and plant engineering welding knowledge of advantage Experience in assembly, pneumatics and hydraulics Travel readiness in Germany and abroad Offer Attractive and modern employment conditions No shift work Varied and interesting task portfolio Modern and exciting workplace in an economically growing family business
- Activities Manufacture, assembly and assembly of machinery assemblies according to drawing.
- Construction and initial commissioning of machine and plant components our at the plant Zofingen Active cooperation in the construction and commissioning of new plants at customers in Germany and abroad Analysis and elimination of (mechanical, pneumatic, hydraulic and electrical) faults and sources of error MIG/MAG/WIG Welding service and repair operations in Germany and abroad
Description
Activities Manufacture, assembly and assembly of machinery assemblies according to drawing. Construction and initial commissioning of machine and plant components our at the plant Zofingen Active cooperation in the construction and commissioning of new plants at customers in Germany and abroad Analysis and elimination of (mechanical, pneumatic, hydraulic and electrical) faults and sources of error MIG/MAG/WIG Welding service and repair operations in Germany and abroad
- Completed training as a polymechanic (m/f/d), automatic (m/f/d) or machine closer (m/f/d) or comparable qualifications Craftsmanship skills and relevant experience in mechanical and plant engineering welding knowledge of advantage Experience in assembly, pneumatics and hydraulics Travel readiness in Germany and abroad Offer Attractive and modern employment conditions No shift work Varied and interesting task portfolio Modern and exciting workplace in an economically growing family business
This page consolidates the key details of the listing and presents them in a structured format for cross-border candidates targeting Aargau.
Always verify required language, actual office location and application flow before submitting: some positions include international interview steps.
Before applying, compare this role with local cost of living and net salary simulation to assess real take-home sustainability.
Questions about this listing
What salary does Stellentreff AG offer for this role?
Stellentreff AG lists CHF 62'000 - 94'000 gross per year for this position in Zofingen. This is the salary published in the original listing (or, when the employer omits a figure, a realistic estimate for the role and sector) — the calculator on this site converts it to your actual net take-home once cross-border tax and social contributions are applied.
Is this a full-time role, and what type of contract does Stellentreff AG offer?
This listing is a full-time position. The contract type shown here comes directly from the employer's original posting; always confirm exact hours, notice period and probation length with Stellentreff AG during the application process, since these details can vary by role even within the same contract category.
Do I need a cross-border work permit for a role in Aargau?
EU/EFTA residents living in the border zone of the country adjoining Canton Aargau can apply for a G permit; the Swiss employer files it with that canton's migration office after the contract is signed. Border-zone rules and processing times vary by neighbouring country and canton, so confirm the specifics with Aargau's cantonal migration office or with HR during the application.
How do I apply for this position at Stellentreff AG?
Use the "Apply now" button on this page — it links directly to Stellentreff AG's original listing at stellentreff.ch, so your application goes straight to the employer's own applicant-tracking system. Frontaliere Ticino does not collect or forward applications itself.